The lack of rain and the Victoria Project, Sri Lanka.


The bed of the Victoria reservoir upstream and the bed of the river downstream from the site of the dam on 12th August 2011. The rains had not arrived but power generation, the aim of the Victoria project was still going on.

Tuesday, August 16, 2011

The Victoria Dam, Sri Lanka.






The egg-shell shaped concrete dam built across the Mahaweli Ganga at Adhikarigama for power generation. This dam was designed and erected on British aid to Sri Lanka.
         Mr.Aruppola, Engineer in Charge, Victoria Project.  Mr.Weerasinghe Technical Officer, on right.